Urban Exchange bridge installation scheduled for Tuesday at 8AM

Yellow, Red Bridge to be installed on Tuesday!
All day tomorrow (Monday) we'll be setting up a HUGE crane next to the Urban Exchange construction site. Then, on Tuesday between 8:00 a.m. and 10:00 a.m. we'll be using the crane to (carefully, slowly) lift the red bridge and the yellow bridge over top of the East Wing, and down between the wings to span the courtyard area.
Feel free to drive by to see the action, or watch it live from across the street! Call me (540-578-0102) or e-mail me (scott@cbfunkhouser.com) with any questions.
Become a fan of Urban Exchange on Facebook!
Are you on Facebook? If so, become a fan of Urban Exchange --- click here to visit the Urban Exchange page on Facebook.