Almost a year ago I mentioned that a new road connecting Erickson Avenue to Stone Spring Road was moving forward. Construction is now moving forward, with lots of progress starting on the Erickson Avenue end of the connector.
Below is a map showing where that will be situated (click on the map for a larger version) and this is a
web site with more details.
City Portion of Erickson Avenue / Stone Spring Road Connector:The road shown above lies in the City, but the Connector will continue into the County, all the way to Route 33 East near Boyers Road.
The map below shows an overlay of the
approved map from VDOT over top of both an aerial and road view from Google Maps. Click on either for a larger view.
Rockingham County Southeast Connector (1 of 2 portions)
As far as I can tell, the County portion will cut through the new campus of
Rockingham Memorial Hospital, and then cross through Boyers Road before connecting with Route 33. From what I have heard, Boyers Road will become a cul-de-sac before reaching Route 33.
Recent Articles: